Silvercorp Reports Operational Results and Financial Results Release Date for the Fiscal 2025, and Issues Fiscal 2026 Production, Cash Costs, and Capital Expenditure Guidance
Werte in diesem Artikel
Trading Symbol: TSX/NYSE American: SVM
VANCOUVER, BC, April 16, 2025 /PRNewswire/ - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX: SVM) (NYSE American: SVM) reports production and sales figures for the fourth quarter ("Q4 Fiscal 2025") and fiscal year ended March 31, 2025 ("Fiscal 2025") and the production and cost guidance for the 2026 fiscal year ending March 31, 2026 ('Fiscal 2026"). Silvercorp expects to release its Fiscal 2025 audited financial results on Thursday, May 22, 2025, after market close.
Q4 Fiscal 2025 Operational Highlights
- Revenue of approximately $75.1 million, an increase of 76% over the same quarter last year ("Q4 Fiscal 2024");
- Ore processed 345,984 tonnes, up 46% over Q4 Fiscal 2024;
- Silver production of 1.6 million ounces, an increase of 42% over Q4 Fiscal 2024; silver equivalent (only silver and gold)i production of approximately 1.9 million ounces, compared to 1.3 million ounces in Q4 Fiscal 2024;
- Lead production of approximately 16.3 million pounds, an increase of 30% over Q4 Fiscal 2024; and
- Zinc production of approximately 4.4 million pounds, a decrease of 3% over Q4 Fiscal 2024.
Fiscal 2025 Operational Highlights
- Record revenue of approximately $298.9 million, up 39% over Fiscal 2024;
- Record silver production of approximately 6.9 million ounces, up 12% and within the Company's annual production guidance to produce 6.8 to 7.2 million ounces of silver in Fiscal 2025; silver equivalent (only silver and gold) production of approximately 7.6 million ounces, an increase of 11% over Fiscal 2024.
Q4 Fiscal 2025 Operational Results
At the Ying Mining District, 304,224 tonnes of ore were processed, up 69% over Q4 Fiscal 2024. Approximately 1,563 Koz (thousands of ounces) of silver, 3,110 oz (ounces) of gold, or 1,850 Koz of silver equivalent plus 15,563 Klbs (thousands of pounds) of lead, and 2,039 Klbs of zinc were produced, representing production increases of 62%, 47%, 50%, 38%, and 17%, respectively, in gold, silver, silver equivalent, lead and zinc over Q4 Fiscal 2024.
At the GC Mine, 41,760 tonnes of ore were processed, down 27% over Q4 Fiscal 2024. Approximately 67 Koz of silver, 699 Klbs of lead, and 2,365 Klbs of zinc were produced, representing decreases of 23%, 42% and 16%, respectively, in silver, lead and zinc over Q4 Fiscal 2024.
Q4 Fiscal 2025 | Q4 Fiscal 2024 | ||||||
Ying Mining District | GC | Consolidated | Ying Mining District | GC | Consolidated | ||
Production Data | |||||||
Ore Processed (tonnes) | 304,224 | 41,760 | 345,984 | 180,267 | 57,226 | 237,493 | |
Gold ore (tonne) | 39,025 | — | 39,025 | 21,843 | — | 21,843 | |
Silver ore (tonne) | 265,199 | 41,760 | 306,959 | 158,424 | 57,226 | 215,650 | |
Head Grades | |||||||
Silver (gram/tonne) | 172 | 61 | 197 | 57 | |||
Lead (%) | 2.6 | 0.9 | 3.1 | 1.1 | |||
Zinc (%) | 0.5 | 2.9 | 0.6 | 2.5 | |||
Recovery Rates | |||||||
Silver (%) | 94.2 | 83.7 | 94.4 | 83.2 | |||
Lead (%) | 92.3 | 87.4 | 95.0 | 89.8 | |||
Zinc (%) | 67.3 | 90.3 | 70.2 | 89.3 | |||
Metal Production | |||||||
Gold (oz) | 3,110 | — | 3,110 | 1,916 | — | 1,916 | |
Silver (Koz) | 1,563 | 67 | 1,630 | 1,063 | 87 | 1,150 | |
Silver equivalent (Koz) | 1,850 | 67 | 1,917 | 1,237 | 87 | 1,324 | |
Lead (Klb) | 15,563 | 699 | 16,262 | 11,317 | 1,210 | 12,527 | |
Zinc (Klb) | 2,039 | 2,365 | 4,404 | 1,750 | 2,809 | 4,559 | |
Metals Sold | |||||||
Gold (oz) | 3,465 | — | 3,465 | 1,916 | — | 1,916 | |
Silver (Koz) | 1,522 | 77 | 1,599 | 1,052 | 87 | 1,139 | |
Lead (Klb) | 15,479 | 784 | 16,263 | 10,821 | 1,051 | 11,872 | |
Zinc (Klb) | 2,087 | 2,401 | 4,488 | 1,730 | 2,702 | 4,432 |
Fiscal 2025 Operational Results
At the Ying Mining District, 1,013,659 tonnes of ore were processed, up 24% over Fiscal 2024. A total of 6,431 Koz of silver, 7,495 oz of gold, or 7.495 Koz of silver equivalent, 56,847 Klbs of lead, and 8,552 Klbs of zinc were produced, representing increases of 13%, 3%, 12%, 1% and 4%, respectively, in silver, gold, silver equivalent, lead and zinc over Fiscal 2024.
At the GC Mine, 299,036 tonnes of ore were processed, up 3% over Fiscal 2024. A total of 517 Koz of silver, 5,323 Klbs of lead, and 14,765 Klbs of zinc were produced, representing decreases of 2%, 23% and 3%, respectively, in silver, lead and zinc over Fiscal 2024.
Year ended March 31, 2025 | Year ended March 31, 2024 | ||||||
Ying Mining District | GC | Consolidated | Ying Mining District | GC | Consolidated | ||
Production Data | |||||||
Ore Processed (tonne) | 1,013,659 | 299,036 | 1,312,695 | 816,145 | 290,050 | 1,106,195 | |
Gold ore (tonne) | 86,488 | — | 86,488 | 58,262 | — | 58,262 | |
Silver ore (tonne) | 927,171 | 299,036 | 1,226,207 | 757,883 | 290,050 | 1,047,933 | |
Head Grades | |||||||
Silver (gram/tonne) | 212 | 67 | 231 | 69 | |||
Lead (%) | 2.8 | 0.9 | 3.4 | 1.2 | |||
Zinc (%) | 0.6 | 2.5 | 0.7 | 2.6 | |||
Recovery Rates | |||||||
Silver (%) | 94.7 | 83.1 | 94.9 | 82.0 | |||
Lead (%) | 93.6 | 89.3 | 95.1 | 90.5 | |||
Zinc (%) | 69.7 | 90.3 | 70.6 | 90.0 | |||
Metal Production | |||||||
Gold (oz) | 7,495 | — | 7,495 | 7,268 | — | 7,268 | |
Silver (Koz) | 6,431 | 517 | 6,948 | 5,677 | 527 | 6,204 | |
Silver equivalent (Koz) | 7,072 | 517 | 7,589 | 6,317 | 527 | 6,844 | |
Lead (Klb) | 56,847 | 5,323 | 62,170 | 56,269 | 6,902 | 63,171 | |
Zinc (Klb) | 8,552 | 14,765 | 23,317 | 8,213 | 15,172 | 23,385 | |
Metals Sold | |||||||
Gold (oz) | 7,577 | — | 7,577 | 7,268 | — | 7,268 | |
Silver (Koz) | 6,405 | 525 | 6,930 | 5,717 | 518 | 6,235 | |
Lead (Klb) | 56,787 | 5,469 | 62,256 | 54,292 | 6,333 | 60,625 | |
Zinc (Klb) | 8,601 | 14,868 | 23,469 | 8,240 | 15,010 | 23,250 |
Fiscal 2026 Production, Cash Costs, and Capital Expenditure Guidance
- Guidance for Fiscal 2026 production, cash and all-in sustaining (AIS)costs
In Fiscal 2026, the Company expects to process 1,331,000 to 1,369,000 tonnes of ore, yielding approximately 8,100 to 9,000 oz of gold, 7,380 to 7,600 Koz of silver, 65,200 to 66,900 Klbs of lead, and 29,300 to 30,300 Klbs of zinc. The guidance represents 1% - 4% increase in ore processed, and 21% to 39% in gold, 6% to 9% in silver, 5% to 8% in lead, and 26% to 30% in zinc metal production, compared to the Fiscal 2025 results.
Production | F2026 Guidance | Year ended March 31, 2025 | |||||||||||||||||||
Ying Mining District | GC | Consolidated | Ying Mining District | GC | Consolidated | ||||||||||||||||
Low | High | Low | High | Low | High | Actual | |||||||||||||||
Ore Processed (tonne) | 1,031,000 | 1,057,000 | 300,000 | 312,000 | 1,331,000 | 1,369,000 | 1,013,659 | 299,036 | 1,312,695 | ||||||||||||
Gold ore (tonne) | 131,000 | 142,000 | — | — | 131,000 | 142,000 | 86,488 | — | 86,488 | ||||||||||||
Silver ore (tonne) | 900,000 | 915,000 | 300,000 | 312,000 | 1,200,000 | 1,227,000 | 927,171 | 299,036 | 1,226,207 | ||||||||||||
Head Grades | |||||||||||||||||||||
Gold (gram/t) | 0.3 | — | 0.3 | — | |||||||||||||||||
Silver (gram/t) | 225 | 74 | 212 | 67 | |||||||||||||||||
Lead (%) | 2.8 | 1.1 | 2.8 | 0.9 | |||||||||||||||||
Zinc (%) | 0.7 | 2.9 | 0.6 | 2.5 | |||||||||||||||||
Metal Production | |||||||||||||||||||||
Gold (oz) | 9,100 | 10,400 | — | — | 9,100 | 10,400 | 7,495 | — | 7,495 | ||||||||||||
Silver (in Koz) | 6,800 | 7,000 | 580 | 600 | 7,380 | 7,600 | 6,431 | 517 | 6,948 | ||||||||||||
Lead (in Klb) | 58,800 | 60,300 | 6,400 | 6,600 | 65,200 | 66,900 | 56,847 | 5,323 | 62,170 | ||||||||||||
Zinc (in Klb) | 11,800 | 12,200 | 17,500 | 18,100 | 29,300 | 30,300 | 8,552 | 14,765 | 23,317 | ||||||||||||
Costs | F2026 Guidance | Nine months ended December 31, 2024 | |||||||||||||||||||
Ying Mining District | GC | Consolidated | Ying Mining District | GC | Consolidated | ||||||||||||||||
Cash Cost ($/t) | 86.8 | 88.4 | 60.3 | 60.8 | 80.7 | 82.1 | 89.2 | 51.4 | 80.2 | ||||||||||||
AISC ($/t) | 157.8 | 160.5 | 90.9 | 92.6 | 154.8 | 157.8 | 146.6 | 77.9 | 145.7 | ||||||||||||
The Ying Mining District plans to process 1,031,000 to 1,057,000 tonnes of ore, to produce 9,100 to 10,400 oz of gold, 6,800 to 7,000 Koz of silver, 58,800 to 60,300 Klbs of lead, and 11,800 to 12,200 Klbs of zinc for Fiscal 2026. This production guidance represents production increases of 2% to 4% in ore, 21% to 39% in gold, 6% to 9% in silver, 3% to 6% in lead and 38% to 43% in zinc, compared to the Fiscal 2025 results.
The cash costii at the Ying Mining District is expected to be $86.8 to $88.4 per tonne of ore, comparable to the cash cost of $89.2 for the first nine months of Fiscal 2025 ended December 31, 2024. The all-in sustaining cost (AISC)ii is estimated at $157.8 to $160.5 per tonne, higher than the AISC of $146.6 recorded in the first nine months of Fiscal 2025 due to the new regulation of 2.3% mineral right royalty in China.
The GC Mine plans to process 300,000 to 312,000 tonnes of ore to produce 580 to 600 Koz of silver, 6,400 to 6,600 Klbs of lead, and 17,500 to 18,100 Klbs of zinc. Fiscal 2026 production guidance at the GC Mine represents production increases of 0.3% to 4% in ore and 12% to 16% in silver, 20% to 24% in lead and 19% to 23% in zinc compared to the Fiscal 2025 results.
The cash cost at the GC Mine is expected to be $60.3 to $60.8 per tonne of ore, compared to $51.4 recorded in the first nine months of Fiscal 2025. The AISC is estimated at $90.9 to $92.6 per tonne of ore processed, compared to $77.9 recorded in the first nine months of Fiscal 2025 as more development tunneling has been planned in Fiscal 2026. The mineral right royalty will not apply to the GC Mine until the mining license is renewed in 2040.
The consolidated cash cost in Fiscal 2026 is expected to be $80.7 to $82.1 per tonne, while the consolidated AISC is expected to be $154.8 to $157.8 per tonne.
- Fiscal 2026 capital expenditure guidance for China Operations
The table below summarizes the capital expenditure the Company expects to be incurred for our projects in China in Fiscal 2026.
Fiscal 2026 Guidance | ||||||
Ying Mining District | GC Mine | Kuanping | Total | |||
Capitalized | Ramp and Development Tunneling1 | (Metres) | 38,800 | 5,700 | 6,300 | 50,800 |
($ Million) | 25.3 | 3.6 | 2.7 | 31.6 | ||
Exploration Tunneling | (Metres) | 67,700 | 11,100 | 1,300 | 80,100 | |
($ Million) | 24.8 | 3.9 | 0.4 | 29.1 | ||
Diamond Drilling | (Metres) | 190,600 | 48,400 | — | 239,000 | |
($ Million) | 5.8 | 1.1 | — | 6.9 | ||
Facilities and Equipment1 | ($ Million) | 17.5 | 0.7 | 0.8 | 19.0 | |
Total | ($ Million) | 73.4 | 9.3 | 3.9 | 86.6 | |
Expensed (included as cash cost) | Mining Preparation Tunneling | (Metres) | 67,300 | 11,400 | — | 78,700 |
($ Million) | 27.1 | 4.6 | — | 31.7 | ||
Diamond Drilling | (Metres) | 58,500 | 12,600 | — | 71,100 | |
($ Million) | 1.7 | 0.3 | 3.9 | 2.0 | ||
Note 1: Items included in AISC |
1. Ying Mining District
The total capital expenditure at the Ying Mining District in Fiscal 2026 is estimated at $73.4 million as the Company continues to optimize the mine plan to increase ore production and grow its mineral resources. Projected spending will be:
- $25.3 million to develop 38,800 metres of ramps and tunnels for transportation and access, included in AISC;
- $24.8 million to develop 67,700 metres of exploration tunnels and $5.8 million to drill 190,600 metres of exploration diamond drill holes; and
- $17.5 million on equipment replacement and facility upgrade and construction, included in AISC.
In addition to the above work, the Company also plans to complete and expense 67,300 metres of mining preparation tunnels and 58,500 metres of diamond drilling at the Ying Mining District, included as part of the cash cost.
2. GC Mine
The total capital expenditure at the GC Mine in Fiscal 2026 is estimated at $9.3 million to maintain its production and mineral resources. Projected spending will be:
- $3.6 million to develop 5,700 metres of ramps and tunnels, included in AISC;
- $3.9 million to develop 11,100 metres of exploration tunnels and $1.1 million to drill 48,400 metres of exploration diamond drill holes; and
- $0.7 million on equipment replacement, facility upgrades and construction, included in AISC.
In addition to the above work, the Company also plans to complete and expense 11,400 metres of mining preparation tunnels and 12,600 metres of diamond drilling at the GC Mine, included as part of the cash cost.
3. Kuanping Project
The Kuanping Project has received all permits and licenses for mine construction, and the access road and site preparation work has started. In Fiscal 2026, the Company will invest $3.9 million for the construction of the mine, which includes $2.7 million on 6,300 metres of ramp and tunnel development $0.4 million on 1,300 metres of exploration tunnels, $0.8 million on equipment.
4. Fiscal 2026 capital expenditure guidance for Ecuador Operations
The Company is preparing a separate press release on the guidance of its Ecuador Operations.
About Silvercorp
Silvercorp is a Canadian mining company producing silver, gold, lead, and zinc with a long history of profitability and growth potential. The Company's strategy is to create shareholder value by 1) focusing on generating free cash flow from long life mines; 2) organic growth through extensive drilling for discovery; 3) ongoing merger and acquisition efforts to unlock value; and 4) long term commitment to responsible mining and ESG. For more information, please visit our website at www.silvercorpmetals.com.
For further information
Silvercorp Metals Inc.
Lon Shaver
President
Phone: (604) 669-9397
Toll Free 1(888) 224-1881
Email: investor@silvercorp.ca
Website: www.silvercorpmetals.com
CAUTIONARY DISCLAIMER - FORWARD-LOOKING STATEMENTS
This news release includes "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable securities laws relating to, among other things statements regarding the Company's Fiscal 2026 production, cash costs, and capital expenditures guidance, and timing of release the Company's Fiscal 2025 audited financial results. By their very nature, forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking information may in some cases be identified by words such as "will", "anticipates", "expects", "intends" and similar expressions suggesting future events or future performance. Forward-looking statements relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company's material properties; estimates of the Company's revenues and capital expenditures; estimated production from the Company's mines in the Ying Mining District and the GC Mine; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company's operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company's properties.
Actual results may vary from forward-looking statements. We caution that all forward-looking information is inherently subject to change and uncertainty and that actual results may differ materially from those expressed or implied by the forward-looking information. A number of risks, uncertainties and other factors, including fluctuating commodity prices; recent market events and condition; estimation of mineral resources, mineral reserves and mineralization and metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; climate change; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into existing operations; permits and licences for mining and exploration in China; title to properties; non-controlling interest shareholders; acquisition of commercially mineable mineral rights; financing; competition; operations and political conditions; regulatory environment in China; regulatory environment and political climate in Bolivia and Ecuador; changes in national and local government's taxation, controls, political or economic developments; integration and operations of Adventus; environmental risks; natural disasters; dependence on management and key personnel; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; conflicts of interest; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; outcome of current or future litigation or regulatory actions; bringing actions and enforcing judgments under U.S. securities laws; cyber-security risks; public health crises; the Company's investment in New Pacific Metals Corp. and Tincorp Metals Inc.; and the other risk factors described in the Company's Annual Information Form and in the Company's Annual Report on Form 40-F, and other filings with Canadian and U.S. regulators on www.sedarplus.ca and www.sec.gov; could cause actual results and events to differ materially from those expressed or implied in the forward-looking information or could cause our current objectives, strategies and intentions to change. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, we warn investors to exercise caution when considering statements containing forward-looking information and that it would be unreasonable to rely on such statements as creating legal rights regarding our future results or plans. We cannot guarantee that any forward-looking information will materialize and you are cautioned not to place undue reliance on this forward-looking information. Any forward-looking information contained in this news release represents expectations as of the date of this news release and is subject to change after such date. However, we are under no obligation (and we expressly disclaim any such obligation) to update or alter any statements containing forward-looking information, the factors or assumptions underlying them, whether as a result of new information, future events or otherwise, except as required by law. All of the forward-looking information in this news release is qualified by the cautionary statements herein.
A comprehensive discussion of other risks that impact Silvercorp can also be found in their public reports and filings which are available under its profile at www.sedarplus.ca.
i Silver equivalent is calculated by converting the gold metal quantity to its silver equivalent using the ratio between the net realized selling prices of gold and silver achieved, and then adding the converted amount expressed in silver ounces to the ounces of silver.
iiCash cost and AISC per tonne are non-GAAP measures. Cash cost per tonne is calculated based on the total cash production cost on a sales basis, adjusted for changes in inventory, to arrive at total cash cost that is related to ore production during the period. The total cash cost is then further divided into mining cost, shipping cost, and milling cost. Cash cost per tonne is the total of per tonne mining cost, per tonne milling cost, and per tonne milling cost. AISC is the extensions of cash cost. AISC per tonne is based on the Company's cash cost, and further include general and administrative expenses, government fees and other taxes, reclamation costs accretion, lease liability payments, and sustaining capital expenditures that already paid. Mineral resources tax, which mainly levy based on revenue, are not included in the calculation of AISC.
View original content to download multimedia:https://www.prnewswire.com/news-releases/silvercorp-reports-operational-results-and-financial-results-release-date-for-the-fiscal-2025-and-issues-fiscal-2026-production-cash-costs-and-capital-expenditure-guidance-302429892.html
SOURCE Silvercorp Metals Inc.
Ausgewählte Hebelprodukte auf Silvercorp Metals
Mit Knock-outs können spekulative Anleger überproportional an Kursbewegungen partizipieren. Wählen Sie einfach den gewünschten Hebel und wir zeigen Ihnen passende Open-End Produkte auf Silvercorp Metals
Der Hebel muss zwischen 2 und 20 liegen
Name | Hebel | KO | Emittent |
---|
Name | Hebel | KO | Emittent |
---|
Nachrichten zu Silvercorp Metals Inc.
Analysen zu Silvercorp Metals Inc.
Datum | Rating | Analyst | |
---|---|---|---|
01.06.2018 | Silvercorp Metals Outperform | BMO Capital Markets | |
15.11.2012 | Silvercorp Metals neutral | UBS AG | |
10.09.2012 | Silvercorp Metals neutral | UBS AG | |
08.08.2012 | Silvercorp Metals outperform | Raymond James Financial, Inc. | |
07.08.2012 | Silvercorp Metals neutral | UBS AG |
Datum | Rating | Analyst | |
---|---|---|---|
01.06.2018 | Silvercorp Metals Outperform | BMO Capital Markets | |
08.08.2012 | Silvercorp Metals outperform | Raymond James Financial, Inc. | |
06.06.2012 | Silvercorp Metals buy | UBS AG | |
01.06.2012 | Silvercorp Metals outperform | Raymond James Financial, Inc. | |
22.05.2012 | Silvercorp Metals buy | UBS AG |
Datum | Rating | Analyst | |
---|---|---|---|
15.11.2012 | Silvercorp Metals neutral | UBS AG | |
10.09.2012 | Silvercorp Metals neutral | UBS AG | |
07.08.2012 | Silvercorp Metals neutral | UBS AG | |
06.08.2012 | Silvercorp Metals neutral | UBS AG | |
10.07.2012 | Silvercorp Metals neutral | UBS AG |
Datum | Rating | Analyst | |
---|---|---|---|
Keine Analysen im Zeitraum eines Jahres in dieser Kategorie verfügbar. Eventuell finden Sie Nachrichten die älter als ein Jahr sind im Archiv |
Um die Übersicht zu verbessern, haben Sie die Möglichkeit, die Analysen für Silvercorp Metals Inc. nach folgenden Kriterien zu filtern.
Alle: Alle Empfehlungen