Contango ORE stock plummets as costs rise at Alaska gold mine
Werte in diesem Artikel
Kinross is the majority owner and operator of the Peak Gold joint venture with Contango ORE. Credit: KinrossShares of Contango ORE (NYSE American: CTGO) plummeted on Friday after the company provided an increased cost guidance for the Manh Choh gold mine in Alaska, which it holds under the Peak Gold joint venture with Kinross Gold (TSX: K, NYSE: KGC) on a 30/70 basis.It is now projected that the all-in sustaining cost (AISC) over Manh Choh’s approximate 4.6-year mine life will be $1,400/oz. of gold equivalent (AuEq) sold, a 25% increase compared to the $1,116/oz. outlined in a 2023 technical report. AISC for 2025 on a standalone basis is expected to be $1,625/oz. AuEq sold.The anticipated rise in AISC, says Contango, relates to recent weight restrictions placed on the bridge used to transport the Manh Choh ore, as well as higher moisture content in the Manh Choh ore, limiting the overall amount of ore being transported annually by approximately 20%. Rising processing costs are also contributing to the higher AISC projections, it adds. Contango ORE’s stock plunged 22.3% to $13.95 by 11:30 on Friday, for a market capitalization of $171.2 million. Earlier, it had fallen to $13.56, the lowest it traded in nearly four years.“While we are disappointed with these new weight restrictions impacting Manh Choh trucking operations, which has an impact on AISC, the Manh Choh project is expected to be very profitable over its current 4-to-5-year mine life, generating significant free cash flow to Contango,” commented CEO Rick Van Nieuwenhuyse.At current hauling rates, and at an assumed spot gold price of $2,500/oz., Contango projects that cash distributions from the Peak Gold JV going into its account next year to be approximately $50 million. This is based on anticipated gold production of 60,000 oz., in line with expectations.For 2024, the company anticipates its share of gold production from the Manh Choh mine to be 38,500 oz., following a successful first pour in early July. Contango and Kinross first formed the Peak Gold JV in 2020. In 2023, mining operations began, with ore transported to Kinross’ Fort Knox facilities for processing.Together with Kinross’ share, it is expected that the Manh Choh mine will deliver approximately 220,000 oz. annually. The deposit has a defined resource of 9.2 million tonnes in the measured and indicated category averaging 4.1 g/t gold and 14 g/t silver, for 1.2 million oz. of contained gold and 4.2 million oz. contained silver.Weiter zum vollständigen Artikel bei Mining.com
Ausgewählte Hebelprodukte auf Contango
Mit Knock-outs können spekulative Anleger überproportional an Kursbewegungen partizipieren. Wählen Sie einfach den gewünschten Hebel und wir zeigen Ihnen passende Open-End Produkte auf Contango
Der Hebel muss zwischen 2 und 20 liegen
Name | Hebel | KO | Emittent |
---|
Name | Hebel | KO | Emittent |
---|
Quelle: Mining.com
Nachrichten zu Contango Ore Inc.
Analysen zu Contango Ore Inc.
Keine Analysen gefunden.